Finally have the M38 down to the frame and the PO drilled several holes on the frame rail sides and underside to accommodate a different motor and transmission positioning. I am in the process of filling those extra holes in and need a couple pictures of what holes should be in the frame rails between the front/rear spring hanger bracket and rear/forward spring hanger on both sides. I have reviewed the M38 reference but it does not cover all of the hole locations in the frame. Your help is greatly appreciated. Thank you
Update: I found Wes' photo gallery of the frame rails. It answered some questions but I need to see a picture of the frame around the pivot bracket for the pedals. There are nine holes drilled in the side and lower edge of the frame in this area. I think that may be excessive
M38 With too many holes in the frame
-
1SGWillys
- Member
- Posts: 15
- Joined: Fri Mar 24, 2017 6:00 pm
- charliebrowndog
- Member
- Posts: 17
- Joined: Fri Sep 16, 2016 6:00 pm
- Location: New Hampton, NH
- wesk
- Site Administrator

- Posts: 16463
- Joined: Sun Apr 03, 2005 6:00 pm
- Location: Wisconsin
- Contact:
This would be the view from the inside of the frame at the same section:


Wes K
45 MB, 51 M38, 54 M37, 66 M101A1, 60 CJ5, 76 DJ5D, 47Bantam T3-C & 5? M100
Mjeeps photo album: http://www.willysmjeeps.com/v2/modules. ... _album.php
45 MB, 51 M38, 54 M37, 66 M101A1, 60 CJ5, 76 DJ5D, 47Bantam T3-C & 5? M100
Mjeeps photo album: http://www.willysmjeeps.com/v2/modules. ... _album.php
